RFPs / RFQs

Request for Proposals – Owner’s Representative Services

Response Deadline: 5:00 PM December 18

The Municipal Water District of Orange County (“MWDOC”) is soliciting proposals from qualified firms (“Respondents”), to provide a range of owner’s representation, project management, construction monitoring and quality assurance consulting services during the pre-construction, bidding, construction, and post-construction phases of the MWDOC Administration Building Seismic Retrofit and Tenant Improvement Project and Seismic Bracing of the South Emergency Operations Center (“Project”). The awarded proposal (“Contract”) will be between MWDOC and the selected Respondent. Respondents must meet the minimum qualifications and requirements set forth herein.

Pre-Bid Meeting: Tuesday November 19, 2019 9:00am at the project site: 18700 Ward St. Fountain Valley, CA 92708 – Check in at Reception Desk.

Request for Bids – MWDOC Computer Room Air Conditioner Replacement Project – CLOSED

Response Deadline: 2:00 PM - Wednesday, June 26, 2019

The Municipal Water District of Orange County (MWDOC) is seeking bids from qualified firms (Contractor) to complete the MWDOC Computer Room Air Conditioner Replacement Project (the “Project”). The work consists of the addition of a new 3-ton Split-system air conditioning unit at the computer server room in Fountain Valley. The project includes all work necessary for a complete operating system, including ductwork modifications, structural supports, connection to existing electrical, connection to existing ALC base EMS system, and all other parts and accessories. Testing and balancing, Owner training, and warranty services are included.

Request for Bids – MWDOC Electrical System Rehabilitation Project – CLOSED

Response Deadline: CLOSED

The Municipal Water District of Orange County (MWDOC) is seeking bids from qualified firms (Contractor) to complete the MWDOC Electrical System Rehabilitation Project (the “Project”). The project in general consists of increasing electrical service to the MWDOC administration building from 350A to 600A; installation of new circuit breaker panels, installation of a new 112.5KVA transformer, installation of a manual transfer switch and a generator tap box for emergency generator power, and removal and demolition of old electrical equipment and appurtances. The building will remain in operation during construction and requires a coordinated weekend switch over to the new feed to allow for continued operations. Following the switchover to the new 600A feed, the old electrical equipment will be removed and deposed of.

A “NON-MANDATORY” Pre-Bid Conference is scheduled for May 14, 2019 at 8:30 AM to review the Project’s existing conditions at 18700 Ward St. Fountain Valley, CA 92708.